Application: It is applied to the construction of the base and bottom layers of engineering projects such as high-grade highways, urban roads, squares, and airports.
Output:500-800 t/h
Installation power: 228.5-365 kW
1.The 2-step mixing technology mixes the cement and ash twice, making the mixture evenly distributed to prevent segregation, more efficient than traditional cement stone mixing plant.
2.Adopting programmable controller, to realize manual operation and automatic operation.
3.Controlling by computer makes it easy to operate and accurate in measurement.
4. The plant can be configured or retrofitted according to different needs.
1. Output from 500t/h to 800t/h
2. Mixing twice for better efficient
3. Switching manual operation and automatic operation at will
4. Measuring feeding materials accurate and continuous
5. Produce different types of mixing materials
6. Easy to operate and maintain.
7. Eco-friendly
8. Wide range of application
MODEL | JWBC500 | JWBC600 | JWBC800 |
OUTPUT | 500t/h | 600t/h | 800t/h |
INSTALLATION POWER | 228.5kW | 304kW | 365kW |
VOLUME OF COLD FEEDER | 4*10m³ | 5*10m³ | 5*10m³ |
BELT WIDTH | 800mm | 1000mm | 1000mm |
MIXING POWER | 2*37kW | 2*45kW | 2*55kW |
SECONDARY MIXING POWER | 2*37kW | 2*45kW | 2*45kW |
POWDER TANK | 100t | 2*100t | 2*100t |
FINISHED PRODUCT TANK | 8.5m³ | 8.5m³ | 15m³ |
UNLOADING HEIGHT | 3.6m | ||
TOTAL WEIGHT | 38/45t | 70t | 75t |
MEASUREMENT METHODS | variable speed measurement |